BSOP 330 Week 6 Lab Assignments DeVry Chapter 14, problems 14.1, 14.3, 14.9, 14.13
You have developed the following simple product structure of items needed for your gift bag for a rush party for prospective pledges in your organization. You forecast 200 attendees. Assume that there is no inventory on hand of any of the items. Explode the bill of material. (Subscripts indicate the number of units required.)
Chapter 14, problems 14.3
The demand for subassembly S is 100 units in week 7. Each unit of S requires 1 unit of T and 2 units of U. Each unit of T requires 1 unit of V, 2 units of W, and 1 unit of X. Finally, each unit of U requires 2 units of Y and 3 units of Z. One firm manufactures all items. It takes 2 weeks to make S, 1 week to make T, 2 weeks to make U, 2 weeks to make V, 3 weeks to make W, 1 week to make X, 2 weeks to make Y, and 1 week to make Z.
a) Construct a product structure. Identify all levels, parents, and components.
b) b) Prepare a time-phased product structure.
Chapter 14, problems 14.9
As the production planner for Gerry Cook Products, Inc., you have been given a bill of material for a bracket that is made up of a base, two springs, and four clamps. The base is assembled from one clamp and two housings. Each clamp has one handle and one casting. Each housing has two bearings and one shaft. There is no inventory on hand.
Your boss at Gerry Cook Products, Inc., has just provided you with the schedule and lead times for the bracket in Problem 14.8. The unit is to be prepared in week 10. The lead times for the components are bracket (1 week), base (1 week), spring (1 week), clamp (1 week), housing (2 weeks), handle (1 week), casting (3 weeks), bearing (1 week), and shaft (1 week). a) Prepare the time-phased product structure for the bracket. b) In what week do you need to start the castings?
Chapter 14, problems 14.13
Electro Fans has just received an order for one thousand 20-inch fans due week 7. Each fan consists of a housing assembly, two grills, a fan assembly, and an electrical unit. The housing assembly consists of a frame, two supports, and a handle. The fan assembly consists of a hub and five blades. The electrical unit consists of a motor, a switch, and a knob. The following table gives lead times, on-hand inventory, and scheduled receipts.
Course Home Work aims to provide quality study notes and tutorials to the students of BSOP 330 Week 6 Lab Assignments DeVry in order to ace their studies.
Course Home Work, BSOP 330 Week 6 Lab Assignments DeVry, Home Work Tutorials, Home Work Solutions, Home Work Essay, Home Work Questions.ACC 565 Wk 7 Assignment 3, ACC403 week 2 assignment, ACC565 Week 10, ACCT 212 (Financial Accounting), ACCT 344 (Entire Course) - Devry, ACCT 344 Final Exam Latest 2014 - Devry, ACCT 346 (Managerial Accounting), ACCT 346 Midterm Exam Updated DeVry, ACCT 504, ACCT 504 Week 8, ACCT 553, ART 101 Week 8, Ashford BUS 401, ASHFORD BUS 640, Ashford HIS 204, ASHFORD MAT 222 Week 3, BA 215 (Business Statistics), BA 215 All Assignments Week 1 -8 - Grantham, BA 225, BA 260, BA 265 (Business Law II), BA 265 (Business Law II) FINAL EXAM, BA 340 All Course Assignments, BA 340 Human Resource, BA 370 (Employment Law), BA 405 Multinational Management, BA 470 Week 3 - 5 - 6 - 7, BA 470 Entrepreneurship, BA350 Principles Of Finance, BIS 155 Final Exam - DeVry, BIS 220 Final Exam, BSOP 429, BSOP 434 Entire Course - Devry, BUS 303 Week 2, BUS 303 Week 3, BUS 303 Week 5, BUS 311 Business Law, BUS 330 Week 1, BUS 330 Week 3, BUS 330 Week 5, BUS 401 Week 4 DQ 1, BUS 401 Week 4 DQ 2, BUS 402 WEEK 4, BUS 405 (Principles of Investment), BUS 475, BUS 475 Final Exam 100 MCQS, BUS 475 Final Exam 600 MCQS, BUS 599 (STRAYER), BUS 599 Assignment, BUS 620 Week 4, BUS 640 Week 1, BUS499 Asignment 4, BUS508 Asignment 1, BUS499 Assignment 3.
BSOP 330 Week 6 Lab Assignments DeVry
No comments:
Post a Comment