Tuesday 19 January 2016

CIS 210 Week 3 Case Study 1 Strayer

CIS 210 Week 3 Case Study 1 Strayer


Case Study 1: Building an Access Control System

Due Week 3 and worth 50 points

As a member of the Information Security team at a small college, you have been made the project manager to install an access control system (ACS) in a dormitory. The ACS will automatically unlock the dormitory doors via an electronic proximity reader and integrate with an existing security camera system. The cameras are designed to face and rotate to record a person as they use their identification card to unlock the door.

Create a 3-4 page project plan for this project in which you:

1. Include a one-half page project scope statement.

2. Define five (5) major tasks, each with one to two (1-2) subtasks. Also write a brief description for each task.

3. Create a Gantt chart illustrating the project tasks (use Microsoft Project or a similar project management program).

4. Create a system diagram illustrating the equipment and connections required for this project (use Microsoft Visio or a similar software package).

Your assignment must follow these formatting requirements:

• Be typed, double-spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

• Include charts or diagrams created in Excel, Visio, MS Project, or one of their equivalents such as Open Project, Dia, and OpenOffice. The completed diagrams/charts must be imported into the Word document before the paper is submitted. 
The specific Course Learning Outcomes associated with this assignment are:

• Distinguish between non-functional and functional requirements.

• Use contemporary CASE tools in process and data modeling.

• Use technology and information resources to research issues in systems analysis and development.

• Write clearly and concisely about Systems Analysis and Development topics using proper writing mechanics and technical style conventions.


Course Home Work aims to provide quality study notes and tutorials to the students of CIS 210 Week 3 Case Study 1 Strayer Latest in order to ace their studies.


Course Home Work – CIS 210 Week 3 Case Study 1 Strayer


Home Work RELI 448 Entire Course DeVry Latest

CIS 210 Week 3 Case Study 1 Strayer


Course Home Work, CIS 210 Week 3 Case Study 1 Strayer Latest, Home Work Tutorials, Home Work Solutions, Home Work Essay, Home Work Questions.ACC 565 Wk 7 Assignment 3, ACC403 week 2 assignment, ACC565 Week 10, ACCT 212 (Financial Accounting),  ACCT 344 (Entire Course) – Devry, ACCT 344 Final Exam Latest 2014 – Devry,  ACCT 346 (Managerial Accounting), ACCT 346 Midterm Exam Updated DeVry, ACCT 504, ACCT 504 Week 8, ACCT 553, ART 101 Week 8, Ashford BUS 401, ASHFORD BUS 640, Ashford HIS 204, ASHFORD MAT 222 Week 3, BA 215 (Business Statistics), BA 215 All Assignments Week 1 -8 – Grantham, BA 225, BA 260, BA 265 (Business Law II), BA 265 (Business Law II) FINAL EXAM, BA 340 All Course Assignments, BA 340 Human Resource, BA 370 (Employment Law), BA 405 Multinational Management, BA 470 Week 3 – 5 – 6 – 7, BA 470 Entrepreneurship, BA350 Principles Of Finance, BIS 155 Final Exam – DeVry, BIS 220 Final Exam, BSOP 429, BSOP 434 Entire Course – Devry, BUS 303 Week 2, BUS 303 Week 3, BUS 303 Week 5, BUS 311 Business Law, BUS 330 Week 1, BUS 330 Week 3, BUS 330 Week 5, BUS 401 Week 4 DQ 1, BUS 401 Week 4 DQ 2, BUS 402 WEEK 4, BUS 405 (Principles of Investment), BUS 475, BUS 475 Final Exam 100 MCQS, BUS 475 Final Exam 600 MCQS, BUS 599 (STRAYER), BUS 599 Assignment, BUS 620 Week 4, BUS 640 Week 1, BUS499 Asignment 4, BUS508 Asignment 1, BUS499 Assignment 3.



CIS 210 Week 3 Case Study 1 Strayer

No comments:

Post a Comment